Nearly every new residential estate in South-East Queensland carries a covenant and a set of design guidelines. They are the reason these estates look coherent, and they are a real cost that is regularly missing from the budget people arrive with.

This explains what they are, what they usually control, and how to work out what a specific estate will require of you — because the detail differs at every one.

What a covenant actually is

A covenant is a binding condition the developer attaches to the land. It is a contractual obligation, not a guideline, and it typically binds subsequent owners for a defined period as well as you.

Alongside it sits a set of design guidelines — the detailed document that says what your house has to look like. In practice the two work together: the covenant creates the obligation, the guidelines set the standard, and a design review panel decides whether your plans comply before you can start.

This is separate from council approval, and passing one does not satisfy the other. You generally need both.

What they usually control

The specifics vary, but most cover some version of the following:

  • Facade. Materials, treatment, sometimes a required mix, and often a minimum spend or a prohibition on the builder's base facade.
  • Roof. Form, pitch, material and colour.
  • Minimum floor area, and sometimes maximum site cover.
  • Setbacks and articulation, beyond whatever the planning scheme already requires.
  • Fencing. Type, height, position and colour, including what may face the street.
  • Driveway. Material and finish, frequently excluding plain concrete.
  • Landscaping. A standard to meet, often including a minimum number of trees, and a deadline to complete it.
  • Storage and appearance. Where caravans, trailers and boats may be kept, and what may be visible from the street.
  • Time limits. A window in which you must start construction after settlement, and another in which you must finish.
  • Repetition rules. Restrictions on building the same facade as a nearby house.

The time limits are the ones that bite

Most people read the facade rules and skim the deadlines. The deadlines are frequently the harder constraint: a requirement to commence within a set period of settlement, and to reach completion within another, can be difficult to meet if your finance, design approval or builder's capacity slips. Find out what they are and what happens if you miss them before you sign the land contract.

Why they cost money

Covenants rarely add a single large line. They add a series of smaller ones that are easy to overlook individually:

  • A facade upgrade because the builder's standard facade does not comply
  • Roof material or colour outside the standard range
  • Fencing to a specified type rather than the cheapest that does the job
  • An exposed aggregate or coloured driveway instead of plain concrete
  • Landscaping and planting to a defined standard, on a deadline
  • A letterbox and, sometimes, a clothesline to a specified design

Individually modest. Together they routinely add several tens of thousands of dollars to a build, and a package price that excludes them is not describing a finished, compliant house.

How they differ between estates

There is no standard covenant. Each developer writes their own, and they vary in strictness, in what they emphasise, and in how the design review is run.

Broadly, premium estates and those closer to established areas tend to be stricter — more prescriptive facade requirements, higher minimum floor areas, tighter landscaping. Larger, more affordable master-planned corridors tend to be looser, but not always, and reputations are unreliable. Two estates a few kilometres apart, run by different developers, can be materially different to build in.

The only way to know is to read the guidelines for the specific estate, and ideally the specific stage — they are sometimes revised between releases.

Approved builder panels

Some estates maintain a panel of builders approved to build there, or offer a faster design approval path to builders already familiar with the guidelines.

This matters more than it sounds. It can restrict who you may engage, or make some builders considerably slower through approval than others. Establish whether the estate operates one before you fall for a builder who is not on it.

What to do before you sign

  • Get the covenant and the design guidelines in writing for the specific estate and stage, and read them yourself.
  • Give them to every builder you are quoting and require the quote to be compliant, not indicative.
  • Ask which items in your quote exist only because of the covenant, and what they cost.
  • Check the deadlines for commencement, completion and landscaping against your realistic timeline.
  • Ask how long design approval usually takes, and how many resubmissions are typical.
  • Confirm whether a builder panel applies.

None of this is a reason to avoid a covenanted estate. The rules are much of why the street will still look good in ten years, and that protects your own value as much as anyone's. The failure is treating them as fine print, discovering the cost at design approval, and having no budget left to absorb it.

Buying in a covenanted estate?

We require builders to tender against the actual guidelines for your estate, so what you are comparing is the compliant, finished house rather than a base facade with the covenant items still to come.

Tell us about your build →

Start here

Tell us which estate you're looking at.

Answer a few questions and we'll assess your brief against our vetted panel.

Compare compliant quotes, not base facades.

Nine questions, about two minutes. We'll come back within 1 business day.

Tell us about your build →