Choosing a builder

How to choose a builder in Brisbane

Eight checks, in the order you should run them. Most people do three of these, in the wrong order, after they've already fallen in love with a display home.

8 min read · Updated July 2026 · Select My Builder

Choosing a builder in Brisbane is not hard because there aren't enough options. It's hard because there are hundreds of licensed residential builders in South-East Queensland, their quotes are structured so differently that they can't be compared as issued, and the information that would actually differentiate them isn't on their websites.

What follows is the sequence we use. It's deliberately front-loaded: the checks that can eliminate a builder outright come first, so you don't spend six weeks falling for a builder you were always going to have to rule out.

1. Check the builder's record before anything else

A builder's regulatory record tells you more in a few minutes than a display home tells you in two hours — and almost nobody looks at it before they have already fallen for a floor plan.

Everything below should be checked and weighed together:

  • Longevity. How long this entity has actually been trading — not how long the people behind it say they've been building.
  • Build volume. What the builder is permitted and financially positioned to turn over, and how close to that ceiling they are currently running.
  • Disciplinary actions. One event over a decade is noise. A pattern is not.
  • Directions to rectify defective work. Both the number and what they were for — a cosmetic direction and a structural one are not the same signal.
  • Bans and suspensions. Current or historical, against the entity and against the people behind it.
  • Related entities. Which other building companies the directors have been involved in, including ones that no longer trade.

Individually, none of these is decisive. A single direction to rectify on an otherwise clean twenty-year record means very little; three in eighteen months alongside a recently incorporated entity and a director with two deregistered companies behind them means a great deal. Reading them together, and knowing what weight each carries, is the difference between a check and a conclusion.

2. Look at financial position, not just longevity

The worst outcome in a residential build is not a disappointing kitchen. It's a builder that stops trading at frame stage with your progress payments already drawn down. Home Warranty cover exists for this, and it is not a substitute for not having it happen.

Longevity is a weak proxy for stability. Plenty of long-established builders have failed, usually after a period of aggressive pricing to keep volume up. The stronger signals are structural:

  • Whether the entity you're contracting with is the one with the trading history
  • Director history across previous building entities, including deregistered ones
  • How the builder is regarded by trades and suppliers — payment behaviour travels fast in a small market
  • Whether pricing is materially below the market for the same specification, which is not the good news it appears to be
A quote that is 12% below three comparable quotes is not a discount. It is either a different scope, a lower allowance, or a builder buying work.

3. Fit the builder to your block, not your floor plan

This is the check most people skip entirely, and it's the one that causes the most expensive surprises in Brisbane specifically. Our topography is not flat. Blocks in the inner north and west, the Redlands and much of the Gold Coast hinterland involve fall, retaining, reactive soils, or all three.

A volume builder with a strong product on a flat 400m² lot in Ripley may be poor value on a sloping 600m² block in Everton Hills — not because they're a bad builder, but because sloping sites sit outside what their pricing model handles well, and the difference arrives as variations.

Before you shortlist, know:

  • Your soil classification (from the geotechnical report — class M and above changes the slab)
  • The fall across the building envelope
  • Whether retaining is required, and whose side of the boundary it sits on
  • Estate covenants, design guidelines and any approved-builder panel
  • Overlays — character, flood, bushfire, vegetation

Where this fits in our process

Site capability is stage three of our process, and one of the five factors in the Suitability Framework — the second half of the Select My Builder Standard. It is the filter that removes the most builders, earliest.

4. Compare inclusions, not headline prices

A gap of $60,000 to $90,000 between two builders quoting the same home is not uncommon, and on larger or more complex builds it can run well into six figures. Very little of that gap is visible in the headline price, which is the least informative number in the document.

Build a single comparison sheet and force every quote onto it. At minimum:

ItemWhat to check
Ceiling height2440mm vs 2590mm vs 2740mm — a large cost and a large feel difference
Windows & glazingSizes, stacker vs sliding, glazing spec, flyscreens
KitchenStone vs laminate, appliance brand and size, overhead runs, pantry
FlooringCoverage area — many quotes tile wet areas only and carpet the rest
ExternalDriveway, fencing, landscaping, letterbox, clothesline — often excluded
ElectricalNumber of points, downlights, data, fans, external power
Air conditioningDucted vs split, zones, whether it's a PC item
Insulation & energyWhat's needed to hit the energy rating for your orientation

5. Test the site cost allowance

Site costs are the largest single source of budget movement between quote and contract in South-East Queensland. Many quotes carry a site cost allowance — a placeholder number, sometimes deliberately conservative, sometimes deliberately not.

Three questions will tell you which you're looking at:

  1. Is this allowance based on a soil test on my block, or a generic figure? If no geotech has been done, it's a guess.
  2. What's included in it? Excavation, retaining, slab upgrade for soil class, service connections, driveway crossover, temporary fencing, sediment control.
  3. At what point does it become fixed? Some builders fix site costs at contract; others carry the allowance into construction and adjust it.

A builder who fixes site costs after a proper geotechnical report is offering something materially different from one carrying an unfixed allowance into a contract. Those two quotes are not comparable, whatever the totals say.

6. Read the contract terms that move the price

Most Queensland residential builds run on one of a small number of standard-form contracts. The base terms are broadly consistent; the schedules and special conditions are not, and that is where the money moves. Four things to look at:

  • Rise and fall / price escalation. Whether the builder can pass through material cost increases after signing, and under what trigger. A "fixed price" with a rise-and-fall clause is not fixed.
  • Provisional sums and PC items. Every one is an open number. Total them up — if 15% of your contract is provisional, 15% of your budget is an estimate.
  • Variation pricing. Whether variations are priced at cost plus a fixed margin, or at whatever the builder quotes at the time.
  • Delay and extension of time. What counts as a claimable delay, and whether there's any liquidated damages provision running the other way.

7. Get references the builder didn't choose

A builder's supplied references will be positive. That tells you very little. What's useful is talking to clients at different stages and, ideally, one who had a problem.

Better questions than "were you happy?":

  • What did your final contract price end up being versus the original quote, and why?
  • How many variations, and who initiated them?
  • How long from signing to site start, and from site start to handover?
  • How many defects at handover, and how long did rectification take?
  • When something went wrong, how did they behave?

Also read the review pattern rather than the average. A builder with 4.8 stars where every negative review is about the same issue — communication, defects, program — is telling you what their weakness is.

8. Ask about current capacity

Builder capacity in South-East Queensland moves constantly with trade availability and pipeline load. A builder who was excellent eighteen months ago may currently be running double the jobs per supervisor.

Ask directly:

  • How many homes are you currently under contract on?
  • How many site supervisors, and how many jobs each?
  • What's your current time from contract signing to slab down?
  • What's your contracted build period, and what did your last five actually take?

The order matters more than the list

Nearly everyone runs these checks in reverse. They start at a display village, pick a home they like, get a quote, and only then — if at all — look at licence, financials and site costs. By that point the emotional decision is made and the checks become a formality rather than a filter.

Run them in the order above and most of the market is eliminated before you've looked at a single floor plan. What's left is a small set of builders who are licensed appropriately, financially sound, suited to your block, and comparable on a like-for-like basis. That's a decision you can make well.

Or have it run for you

This is the work Select My Builder does as a managed process — assessment against the Select My Builder Standard, competitive tender on the same scope, and a ranked shortlist with the reasoning attached.

Tell us about your build →

Start here

Or have the eight checks run for you.

Answer a few questions and we'll assess your brief against our vetted panel.

Get a shortlist built around your block and budget.

Nine questions, about two minutes. We'll come back within 1 business day.

Tell us about your build →